Drilling Projects
| Updated |
Location |
Prov |
Contact |
Application |
Approval |
Start |
Finish |
Value |
|
Gentry Resources Ltd., 2500, 101 - 6 Avenue SW, Calgary, AB T2P 3P4, Phone: (403) 264-6161 Fax: (403) 266-3069
|
| 2/May/2007* |
00-00-031-05W4 |
AB |
Gordon McKay, (403) 264-6161 |
|
|
|
31/Dec/2007 |
|
| Sedalia, 10 Wells, Planned |
|
| 2/May/2007 |
00-00-019-10W4 |
AB |
Gordon McKay, (403) 264-6161 |
|
|
|
31/Dec/2007 |
|
| West Tide Lake, 15 - 20 Wells, Planned |
|
|
Grand Banks Energy Corporation, Suite 1600, 444 - 5th Avenue SW,
Calgary, AB T2P 2T8, Phone: (403) 262-8666 Fax: (403) 262-8796 |
| 2/May/2007* |
00-00-007-29W1 |
MB |
|
|
|
|
31/Dec/2007 |
|
| Sinclair, 6 - 10 Wells, Planned |
|
|
TriStar Oil & Gas Ltd., Suite 3100, Sq. II, 205 - 5 Avenue,
Calgary, AB T2P 2V7, Phone: (403) 268-7800 Fax: (403) 218-6075 |
| 2/May/2007 |
00-00-037-07W4 |
AB |
Dean Tucker, (403) 262-9077 |
|
|
|
31/Dec/2007 |
|
| Provost, 20 - 25 Gas Wells, Planned |
|
Facility Projects
| Updated |
Location |
Prov |
Contact |
Application |
Approval |
Start |
Finish |
Value |
|
Bonavista Energy Trust, 700, 311 6th Avenue S.W., Calgary, AB T2P 3H2, Phone: (403) 213-4300 Fax: (403) 262-5184
|
| 2/May/2007 |
02-20-036-03W5 |
AB |
|
|
|
|
|
|
| Lanaway,
Multiwell Oil Battery, Maximum Sulphur Inlet Rate 0.1 mol/kmol, Oil
Inlet Rate 150 Cubic Metres/d, Water Inlet Rate 100 Cubic Metres/d, Gas
Inlet Rate 30,000 Cubic Metres/d, Project Includes Group Separator,
Dump Separator, Waste Tank, Neat Chemical Tank, Line Heater, Sweetening
Tower, Planned |
| EPCM: |
Rangeland Engineering Ltd. : Sasha Robey, (403) 265-5130 |
|
|
Canadian Natural Resources Limited, 2500, 855 - 2 Street SW, Calgary,
AB T2P 4J8, Phone: (403) 517-6700 Fax: (403) 517-7350 |
| 2/May/2007 |
11-02-088-11W6 |
AB |
|
|
|
|
|
|
| Clear
Hills, Multiwell Gas Battery, Maximum Sulphur Inlet Rate 2.2 mol/kmol,
Gas Inlet Rate 50,000 Cubic Metres/d, Project Includes 164 kW Gas
Compressor, 100 bbl Produced Water Tank with Secondary Containment, 2
Phase Inlet Separator, Flare Stack with Integral Knock Out, Approved |
|
|
ConocoPhillips Canada Limited, 401 - 9th Avenue S.W., Calgary, AB T2P 2H7, Phone: (403) 233-4000 Fax: (403) 233-5143
|
| 2/May/2007 |
03-03-043-14W4 |
AB |
|
|
|
|
|
|
| Wavy
Lake, Multiwell Gas Battery, Maximum Sulphur Inlet Rate 1.1 mol/kmol,
Gas Inlet Rate 35,000 Cubic Metres/d, Project Includes Removal of 101
kW Gas Compressor, Install 149 kW Gas Compressor, 1st Stage Suction,
Interstage Scrubber, Intercooler, Aftercooler, Methanol Pump, Produced
Water Tank, Flare Stack with Knock Out Drum To Existing Facility,
Approved |
| EPCM: |
Tailwaters Regulatory Ltd. : Larry Briggs, (403) 236-8861 |
|
|
Fairborne Energy Trust, 3400, 450 - 1 Street SW, Calgary, AB T2P 5H1, Phone: (403) 290-7750 Fax: (403) 290-7751
|
| 2/May/2007 |
08-13-045-15W5 |
AB |
|
|
|
|
|
|
| Columbia,
Compressor Station, Maximum Sulphur Inlet Rate 9.8 mol/kmol, Gas Inlet
Rate 70,800 Cubic Metres/d, Condensate Inlet Rate 10 Cubic Metres/d,
Project Includes 298 kW Gas Compressor, Inlet Separator, Group
Separator, Blowcase, Flare Knock Out Drum, LP & HP Flare Stacks,
Planned |
| EPCM: |
Ascent Consulting Ltd. : Bill Alston, (403) 295-1900 |
|
|
Petro-Canada, 150 - 6 Avenue SW, Calgary, AB T2P 3E3, Phone: (403) 296-8000 Fax: (403) 296-3030
|
| 2/May/2007 |
00-00-097-10W4 |
AB |
|
|
|
15/May/2007 |
|
|
| Fort
McMurray, CH2M Hill Awarded Contract to Provide Engineering &
Procurement For Infrastructure Utilities Work on Fort Hills Project |
|
|
Synenco Energy Inc., Suite 1000, 715 - 5th Avenue SW, Calgary, AB T2P 2X6, Phone: (403) 261-1990 Fax: (403) 514-8028
|
| 2/May/2007* |
00-00-070-22W5 |
AB |
Tara Schauerte, (403) 261-1990 |
|
|
|
|
$6,300,000,000 |
| Sturgeon County, 200,000 bbls/d Upgrader, Project On HOLD |
|
Maintenance Projects
| Updated |
Location |
Prov |
Contact |
Application |
Approval |
Start |
Finish |
Value |
|
Suncor Energy Inc., 112 - 4 Avenue SW, Calgary, AB T2P 2V5, Phone: (403) 269-8100 Fax: (403) 269-6200
|
| 2/May/2007* |
|
ON |
|
|
|
1/Aug/2007 |
30/Sep/2007 |
|
| Sarnia, Eight Week Shut Down to Install Hydrocracking Equipment, Planned |
| EPCM: |
Flint Energy Services Ltd. : Cheryl Levy, (519) 383-3615 |
|
Other Projects
| Updated |
Location |
Prov |
Contact |
Application |
Approval |
Start |
Finish |
Value |
|
AltaLink Management Ltd., 1035 - 7th Avenue SW P.O. Box 20, Calgary, AB T2P 3G9, Phone: (403) 267-3478 Fax: (403) 267-3444
|
| 2/May/2007 |
13-35-055-20W4 |
AB |
Teresa Brown, (403) 267-3476 |
|
|
22/Jun/2007 |
31/Aug/2007 |
$984,000 |
| Bruderheim, Install 138 kV, 45 MVAR Capacitor Bank & 138 kV Circuit Breaker to its Bruderheim 127S Substation, Proposed |
|
| 2/May/2007 |
13-07-050-24W4 |
AB |
Teresa Brown, (403) 267-3476 |
|
|
22/Jun/2007 |
31/Aug/2007 |
$908,000 |
| Nisku, Install 138 kV, 30 MVAR Capacitor Bank & a 138 kV Circuit Breaker at its Existing 149S Substation, Proposed |
|
|
ATCO Electric, 10035 - 105 Street, Edmonton, AB T5J 2V6, Phone: (780) 420-7310 Fax: (780) 420-7400
|
| 2/May/2007 |
01-21-070-05W6 |
AB |
Kenneth Pearce, (780) 420-3275 |
|
|
22/May/2007 |
1/Dec/2007 |
$1,652,000 |
| Grande
Prairie, Add a 25/33/42 MVA 144-13.8 kV Transformer, 144 kV Circuit
Breaker, Two 13.8 kV Breakers & Associated Switching, Protection
and Control Equipment to Proctor & Gamble 808S Substation, Proposed |
|
|
Atlantic Wind Power Corp. Inc., Port Maitland, Yarmouth, NS, Phone: (902) 649-2588
|
| 2/May/2007 |
|
NS |
|
|
|
|
|
$90,000,000 |
| Pugwash, 45 MW Wind Power Project, Consisting of 21 -27 Turbines, Pending Approvals |
|
Pipeline Projects
| Updated |
Location |
Prov |
Contact |
Application |
Approval |
Start |
Finish |
Value |
|
Canadian Natural Resources Limited, 2500, 855 - 2 Street SW, Calgary,
AB T2P 4J8, Phone: (403) 517-6700 Fax: (403) 517-7350 |
| 2/May/2007 |
|
BC |
|
|
|
|
|
|
| Altares, Natural Gas Pipelines Totaling 2.74 km - 4" Pipe, Approved |
|
|
Canetic Resources Trust, Suite 1900, 255 - 5 Avenue SW, Calgary, AB T2P 3G6, Phone: (403) 539-6300 Fax: (403) 539-6499
|
| 2/May/2007 |
07-22-042-03W5 |
AB |
|
|
|
|
|
|
| Gilby, Natural Gas Pipeline, 5.91 km - 3" Pipe, Approved |
|
| 2/May/2007 |
12-19-043-07W5 |
AB |
|
|
|
|
|
|
| Pembina, Natural Gas Pipeline, 5.73 km - 3" Pipe, Approved |
|
|
ConocoPhillips Canada Limited, 401 - 9th Avenue S.W., Calgary, AB T2P 2H7, Phone: (403) 233-4000 Fax: (403) 233-5143
|
| 2/May/2007 |
06-07-011-27W4 |
AB |
|
|
|
|
|
|
| Eastmont, Natural Gas Pipeline, 4.68 km - 3" Pipe, Approved |
| EPCM: |
Tailwaters Regulatory Ltd. : Larry Briggs, (403) 236-8861 |
|
|
Duvernay Oil Corp., 1500, 202 - 6 Avenue SW, Calgary, AB T2P 2R9, Phone: (403) 571-3600 Fax: (403) 269-6510
|
| 2/May/2007 |
07-33-053-23W5 |
AB |
|
|
|
|
|
|
| Obed, Natural Gas Pipeline, 5.09 km - 4" Pipe, Approved |
| EPCM: |
Tundra Engineering Associates Ltd. : Jodi Laich, (403) 508-3512 |
|
|
EnCana Corporation, 1800, 855 - 2 Street SW, Calgary, AB T2P 2S5, Phone: (403) 645-2000 Fax: (403) 645-3400
|
| 2/May/2007 |
10-05-025-27W4 |
AB |
|
|
|
|
|
|
| Ardenode, Natural Gas Pipeline, 6.47 km - 3" Pipe, Approved |
| EPCM: |
DPH Engineering Inc. : Andy Yu, (403) 287-4841 |
|
| 2/May/2007 |
01-11-027-24W4 |
AB |
|
|
|
|
|
|
| Entice, Natural Gas Pipeline, 7.14 km - 2" Pipe. Approved |
| EPCM: |
DPH Engineering Inc. : Kristen De Jong, (403) 214-7133 |
|
|
Enerplus Resources Fund, 3000, 333 - 7th Avenue S.W., Calgary, AB T2P 2Z1, Phone: (403) 298-2200 Fax: (403) 298-2211
|
| 2/May/2007 |
09-16-023-15W4 |
AB |
|
|
|
|
|
|
| Verger, Natural Gas Pipeline, 7.57 km - 2" Pipe, Approved |
| EPCM: |
Accutech (2003) Ltd. : Cory Campbell, (403) 218-4763 |
|
|
Result Energy Inc., 2010, 355 - 4 Avenue S.W., Calgary, AB T2P 3C4, Phone: (403) 777-0007 Fax: (403) 234-7116
|
| 2/May/2007 |
13-18-088-11W6 |
AB |
|
|
|
|
|
|
| Clear Hills, Natural Gas Pipeline, 7.55 km - 4" Pipe, Approved |
| EPCM: |
D.L. Bicknell & Associates Ltd. : Doug Bicknell, (403) 263-3722 |
|
* Revised project.
|