P.O.S.T. Report

Sample Report

The following is an example of the information you will see in the Nickle’s Full P.O.S.T. Report with projects being added and updated daily. Alternatively, you may subscribe to a specialized daily report on one segment of interest (drilling, facilities or pipelines) at a lower subscription price, or subscribe to a quarterly report of all projects--also at a lower price. Nickle’s also publishes an abbreviated version of the report called P.O.S.T. Tidbits which is updated monthly.

Drilling Projects

Updated Location Prov Contact Application Approval Start Finish Value
Gentry Resources Ltd., 2500, 101 - 6 Avenue SW, Calgary, AB T2P 3P4, Phone: (403) 264-6161 Fax: (403) 266-3069
2/May/2007* 00-00-031-05W4 AB Gordon McKay, (403) 264-6161


31/Dec/2007
Sedalia, 10 Wells, Planned


2/May/2007 00-00-019-10W4 AB Gordon McKay, (403) 264-6161


31/Dec/2007
West Tide Lake, 15 - 20 Wells, Planned


Grand Banks Energy Corporation, Suite 1600, 444 - 5th Avenue SW, Calgary, AB T2P 2T8, Phone: (403) 262-8666 Fax: (403) 262-8796
2/May/2007* 00-00-007-29W1 MB


31/Dec/2007
Sinclair, 6 - 10 Wells, Planned


TriStar Oil & Gas Ltd., Suite 3100, Sq. II, 205 - 5 Avenue, Calgary, AB T2P 2V7, Phone: (403) 268-7800 Fax: (403) 218-6075
2/May/2007 00-00-037-07W4 AB Dean Tucker, (403) 262-9077


31/Dec/2007
Provost, 20 - 25 Gas Wells, Planned


Facility Projects

Updated Location Prov Contact Application Approval Start Finish Value
Bonavista Energy Trust, 700, 311 6th Avenue S.W., Calgary, AB T2P 3H2, Phone: (403) 213-4300 Fax: (403) 262-5184
2/May/2007 02-20-036-03W5 AB




Lanaway, Multiwell Oil Battery, Maximum Sulphur Inlet Rate 0.1 mol/kmol, Oil Inlet Rate 150 Cubic Metres/d, Water Inlet Rate 100 Cubic Metres/d, Gas Inlet Rate 30,000 Cubic Metres/d, Project Includes Group Separator, Dump Separator, Waste Tank, Neat Chemical Tank, Line Heater, Sweetening Tower, Planned
EPCM: Rangeland Engineering Ltd. : Sasha Robey, (403) 265-5130


Canadian Natural Resources Limited, 2500, 855 - 2 Street SW, Calgary, AB T2P 4J8, Phone: (403) 517-6700 Fax: (403) 517-7350
2/May/2007 11-02-088-11W6 AB




Clear Hills, Multiwell Gas Battery, Maximum Sulphur Inlet Rate 2.2 mol/kmol, Gas Inlet Rate 50,000 Cubic Metres/d, Project Includes 164 kW Gas Compressor, 100 bbl Produced Water Tank with Secondary Containment, 2 Phase Inlet Separator, Flare Stack with Integral Knock Out, Approved


ConocoPhillips Canada Limited, 401 - 9th Avenue S.W., Calgary, AB T2P 2H7, Phone: (403) 233-4000 Fax: (403) 233-5143
2/May/2007 03-03-043-14W4 AB




Wavy Lake, Multiwell Gas Battery, Maximum Sulphur Inlet Rate 1.1 mol/kmol, Gas Inlet Rate 35,000 Cubic Metres/d, Project Includes Removal of 101 kW Gas Compressor, Install 149 kW Gas Compressor, 1st Stage Suction, Interstage Scrubber, Intercooler, Aftercooler, Methanol Pump, Produced Water Tank, Flare Stack with Knock Out Drum To Existing Facility, Approved
EPCM: Tailwaters Regulatory Ltd. : Larry Briggs, (403) 236-8861


Fairborne Energy Trust, 3400, 450 - 1 Street SW, Calgary, AB T2P 5H1, Phone: (403) 290-7750 Fax: (403) 290-7751
2/May/2007 08-13-045-15W5 AB




Columbia, Compressor Station, Maximum Sulphur Inlet Rate 9.8 mol/kmol, Gas Inlet Rate 70,800 Cubic Metres/d, Condensate Inlet Rate 10 Cubic Metres/d, Project Includes 298 kW Gas Compressor, Inlet Separator, Group Separator, Blowcase, Flare Knock Out Drum, LP & HP Flare Stacks, Planned
EPCM: Ascent Consulting Ltd. : Bill Alston, (403) 295-1900


Petro-Canada, 150 - 6 Avenue SW, Calgary, AB T2P 3E3, Phone: (403) 296-8000 Fax: (403) 296-3030
2/May/2007 00-00-097-10W4 AB

15/May/2007

Fort McMurray, CH2M Hill Awarded Contract to Provide Engineering & Procurement For Infrastructure Utilities Work on Fort Hills Project


Synenco Energy Inc., Suite 1000, 715 - 5th Avenue SW, Calgary, AB T2P 2X6, Phone: (403) 261-1990 Fax: (403) 514-8028
2/May/2007* 00-00-070-22W5 AB Tara Schauerte, (403) 261-1990



$6,300,000,000
Sturgeon County, 200,000 bbls/d Upgrader, Project On HOLD


Maintenance Projects

Updated Location Prov Contact Application Approval Start Finish Value
Suncor Energy Inc., 112 - 4 Avenue SW, Calgary, AB T2P 2V5, Phone: (403) 269-8100 Fax: (403) 269-6200
2/May/2007*
ON

1/Aug/2007 30/Sep/2007
Sarnia, Eight Week Shut Down to Install Hydrocracking Equipment, Planned
EPCM: Flint Energy Services Ltd. : Cheryl Levy, (519) 383-3615


Other Projects

Updated Location Prov Contact Application Approval Start Finish Value
AltaLink Management Ltd., 1035 - 7th Avenue SW P.O. Box 20, Calgary, AB T2P 3G9, Phone: (403) 267-3478 Fax: (403) 267-3444
2/May/2007 13-35-055-20W4 AB Teresa Brown, (403) 267-3476

22/Jun/2007 31/Aug/2007 $984,000
Bruderheim, Install 138 kV, 45 MVAR Capacitor Bank & 138 kV Circuit Breaker to its Bruderheim 127S Substation, Proposed


2/May/2007 13-07-050-24W4 AB Teresa Brown, (403) 267-3476

22/Jun/2007 31/Aug/2007 $908,000
Nisku, Install 138 kV, 30 MVAR Capacitor Bank & a 138 kV Circuit Breaker at its Existing 149S Substation, Proposed


ATCO Electric, 10035 - 105 Street, Edmonton, AB T5J 2V6, Phone: (780) 420-7310 Fax: (780) 420-7400
2/May/2007 01-21-070-05W6 AB Kenneth Pearce, (780) 420-3275

22/May/2007 1/Dec/2007 $1,652,000
Grande Prairie, Add a 25/33/42 MVA 144-13.8 kV Transformer, 144 kV Circuit Breaker, Two 13.8 kV Breakers & Associated Switching, Protection and Control Equipment to Proctor & Gamble 808S Substation, Proposed


Atlantic Wind Power Corp. Inc., Port Maitland, Yarmouth, NS, Phone: (902) 649-2588
2/May/2007
NS



$90,000,000
Pugwash, 45 MW Wind Power Project, Consisting of 21 -27 Turbines, Pending Approvals


Pipeline Projects

Updated Location Prov Contact Application Approval Start Finish Value
Canadian Natural Resources Limited, 2500, 855 - 2 Street SW, Calgary, AB T2P 4J8, Phone: (403) 517-6700 Fax: (403) 517-7350
2/May/2007
BC




Altares, Natural Gas Pipelines Totaling 2.74 km - 4" Pipe, Approved


Canetic Resources Trust, Suite 1900, 255 - 5 Avenue SW, Calgary, AB T2P 3G6, Phone: (403) 539-6300 Fax: (403) 539-6499
2/May/2007 07-22-042-03W5 AB




Gilby, Natural Gas Pipeline, 5.91 km - 3" Pipe, Approved


2/May/2007 12-19-043-07W5 AB




Pembina, Natural Gas Pipeline, 5.73 km - 3" Pipe, Approved


ConocoPhillips Canada Limited, 401 - 9th Avenue S.W., Calgary, AB T2P 2H7, Phone: (403) 233-4000 Fax: (403) 233-5143
2/May/2007 06-07-011-27W4 AB




Eastmont, Natural Gas Pipeline, 4.68 km - 3" Pipe, Approved
EPCM: Tailwaters Regulatory Ltd. : Larry Briggs, (403) 236-8861


Duvernay Oil Corp., 1500, 202 - 6 Avenue SW, Calgary, AB T2P 2R9, Phone: (403) 571-3600 Fax: (403) 269-6510
2/May/2007 07-33-053-23W5 AB




Obed, Natural Gas Pipeline, 5.09 km - 4" Pipe, Approved
EPCM: Tundra Engineering Associates Ltd. : Jodi Laich, (403) 508-3512


EnCana Corporation, 1800, 855 - 2 Street SW, Calgary, AB T2P 2S5, Phone: (403) 645-2000 Fax: (403) 645-3400
2/May/2007 10-05-025-27W4 AB




Ardenode, Natural Gas Pipeline, 6.47 km - 3" Pipe, Approved
EPCM: DPH Engineering Inc. : Andy Yu, (403) 287-4841


2/May/2007 01-11-027-24W4 AB




Entice, Natural Gas Pipeline, 7.14 km - 2" Pipe. Approved
EPCM: DPH Engineering Inc. : Kristen De Jong, (403) 214-7133


Enerplus Resources Fund, 3000, 333 - 7th Avenue S.W., Calgary, AB T2P 2Z1, Phone: (403) 298-2200 Fax: (403) 298-2211
2/May/2007 09-16-023-15W4 AB




Verger, Natural Gas Pipeline, 7.57 km - 2" Pipe, Approved
EPCM: Accutech (2003) Ltd. : Cory Campbell, (403) 218-4763


Result Energy Inc., 2010, 355 - 4 Avenue S.W., Calgary, AB T2P 3C4, Phone: (403) 777-0007 Fax: (403) 234-7116
2/May/2007 13-18-088-11W6 AB




Clear Hills, Natural Gas Pipeline, 7.55 km - 4" Pipe, Approved
EPCM: D.L. Bicknell & Associates Ltd. : Doug Bicknell, (403) 263-3722


* Revised project.